Building Project Update for 1/19/2026

Published January 8, 2026

Upcoming Activity


Last Week's Activity

The majority of what you are seeing is the placement of large pipes 10 or more feet in the ground that are going to be used to manage storm water. The front of the campus will have the majority of the parking and all the water collected will be routed around the building and back to the retention pond


A variety of construction materials, including concrete pipes, manhole sections, and metal beams, sit on a dirt lot under a clear blue sky.A construction site with various machinery, including a Bobcat loader and a CAT excavator, on a large expanse of red dirt with piles of soil and tire tracks.A yellow excavator on a construction site with red clay soil is digging a trench to lay large black corrugated drainage pipes. Several workers are on site.