Schedule

Key Dates

10/15/2026: Building A & B wall rough-in complete.

10/15/2026 - 10/16/2026: No water service on the campus while the sewer system is being upgraded.

10/18/2026: Testify Building Tour (1 of 2)

10/31/2026: Building A & B drywall hanging complete.

11/1/2026: Testify Building Tour (2 of 2)

11/9/2026 - 11/11/2026:

11/25/2026: Building C shell will be completed and an access tunnel will be installed.

11/25/2026: Rear construction entrance returns to the current location but using the access tunnel will be required.

2/1/2026: The tunnel entrance will shift to a new construction entrance that utilizes the main corridor between the existing and new buildings.  This will remain the construction entrance through the remainder of the construction project.

2/1/2026: The temporary construction lobby and original kids area will be closed for remodeling.


Feedback Email

On Tuesday (10/6/2026) the church received an email from Yami.  I was so happy to read the email below.  To me, this is simply evidence that when we represent Jesus and speak the truth in love...it makes a real world difference in people's lives:

"Good morning, Discovery Church. My name is Yamilet, and I want to congratulate you on the wonderful action you have taken by offering a Bible teaching every Tuesday to all the employees of the companies working on the construction of the temple. My husband is not a Christian, but he is working on this project, and he tells me that he feels very comfortable there. He says that he does not feel judged for saying that he is not a Christian. He often talks to me about the teachings you share and tells me about everything he learns. May God bless you all greatly, and please continue doing this always."


Sharing My Testimony

Today Pastor Gary, one of the site foremen, invited me to speak and share my testimony with the construction crews.  He opened with Psalm 34:8...taste and see that the Lord is good.  He had several men come forward and taste several snacks...to see if they were good.  While the doughnuts and cookies were a bit hit, the Flamin' Hot Dill Pickle Cheetos were not.  (Except DJ, he thought they were great.)

Once Gary finished I shared my testimony.  I pointed out that I have spent almost three times longer working in construction than I have worked for a church.  I pointed out that I once was a person I didn't like very much.  I was a selfish, hateful, lying...you get the idea...and that eventually I tried to taste and I found that the Lord was good.

I encouraged the people listening to look at themselves and see if there was anything they didn't like or would change.  I pointed out that God can change them and that they should be brave enough to taste and see if He is good.  It was a real privilege to share my story with them.  Please join me in prayer that it will plant a seed in someone's life.

A diverse group of construction workers in hard hats and safety vests gather inside an unfinished building for a meeting.
A group of construction workers gather for a meeting inside a building under construction. Some sit on stacks of metal studs while others stand and listen.A foreman in a yellow safety vest briefs a group of construction workers inside a building with exposed metal framing during a toolbox talk.

Current Activity


Last Week's Activity

9/28/2026 through 10/2/2026



Main Parking Lot

Building "A" - Exterior

Building "A" - Interior

Building "B"

Building "C"