Building Project Update for 10/21/2026

Published October 21, 2026

Schedule

Key Dates

10/22/2026: Building C slab pour.

10/26/2026 - 10/29/2026: Sewer lift station pump and tank upgrade.

10/31/2026: Building A & B drywall hanging complete.

11/1/2026: Testify Building Tour (2 of 2)

11/9/2026 - 11/11/2026:

11/25/2026: Building C shell will be completed and an access tunnel will be installed.

11/25/2026: Rear construction entrance returns to the current location but using the access tunnel will be required.

2/1/2026: The tunnel entrance will shift to a new construction entrance that utilizes the main corridor between the existing and new buildings.  This will remain the construction entrance through the remainder of the construction project.

2/1/2026: The temporary construction lobby and original kids area will be closed for remodeling.


Current Activity


Last Week's Activity

10/12/2026 through 10/16/2026



Building "A" - Exterior

Building "A" - Interior

Building "A" - Raked Seating

Main Parking Area

Sewer Upgrade

Building "B" - Exterior

Roof Drain Connection

Building "C"