Building Project Update for 10/21/2026
Schedule
Key Dates
10/22/2026: Building C slab pour.
10/26/2026 - 10/29/2026: Sewer lift station pump and tank upgrade.
10/31/2026: Building A & B drywall hanging complete.
11/1/2026: Testify Building Tour (2 of 2)
11/9/2026 - 11/11/2026:
11/25/2026: Building C shell will be completed and an access tunnel will be installed.
11/25/2026: Rear construction entrance returns to the current location but using the access tunnel will be required.
2/1/2026: The tunnel entrance will shift to a new construction entrance that utilizes the main corridor between the existing and new buildings. This will remain the construction entrance through the remainder of the construction project.
2/1/2026: The temporary construction lobby and original kids area will be closed for remodeling.
Current Activity
Last Week's Activity
10/12/2026 through 10/16/2026
Building "A" - Exterior
Building "A" - Interior
Building "A" - Raked Seating