Building Project Update for 4/14/2026

Published April 14, 2026

Timelapse Archive

This is a bit of a side note but I have taken the weekly time-lapse videos and consolidated them into two videos.  Each video is approx. three minutes and covers three months of construction time.  When people ask when we are going to start building the church...feel free to share these videos.  Also, keep in mind how much of the work that has taken place outside the view of the camera.  That's a lot of work.


Upcoming Activity


Last Week's Activity

4/06/2026 through 4/10/2026




A construction site with red dirt where several deep, rectangular holes for foundations have been dug. A yellow excavator is visible in the background.A long trench at a construction site with a steel rebar cage inside, ready for a concrete foundation pour. A building wrapped in Tyvek is to the left.
A high-angle view of a construction site showing a steel rebar grid set on a concrete footing, surrounded by red clay soil, in preparation for pouring concrete.A construction site with a large rebar cage set on a concrete footing in red dirt, ready for a foundation pour, with a house wrap wall in the background.A construction site with red clay soil. A square hole is dug for a foundation footing, and a steel rebar cage sits inside, ready for concrete.Three construction workers in safety gear pour wet concrete from a chute into a footing hole on a red clay construction site on a sunny day.A wide view of a commercial property with a building, a new asphalt parking lot, and a large grassy lawn in the foreground under a partly cloudy blue sky.
New sewer line route.A wide, freshly cleared path of red clay winds through a sunlit forest filled with tall, leafy green trees on a bright day.A yellow excavator on a cleared construction site with red clay soil, surrounded by a green forest. A long concrete pipe is being installed in the ground.