Construction Update (11/6/2025)

Published November 6, 2025
Construction Update (11/6/2025)

This week the primary focus of the construction effort was on the back parking lot.  It was regraded, a retaining wall built, gravel base packed, and the binder layer of asphalt is expected to be placed on the drive portion tomorrow (Friday 11/7).  The parking lot will be available for Sundays but may be blocked off and on throughout the next few weeks.

Also, the storage containers that were in the parking lot were relocated behind the kid's classroom trailers.

A long, unpaved gravel road under a clear blue sky, lined with trees showing autumn colors. A construction road grader is parked on the grass to the right.A wide view of a dirt lot and construction site on a sunny fall day. Tall trees with autumn leaves stand against a clear blue sky, with a building in the back.A wide, unpaved gravel lot at a construction site under a bright sun and clear blue sky. A building is on the left and portable trailers are on the right.A wide view of a newly paved area next to a building on a sunny day. Construction equipment is visible in the background, near trees with autumn leaves.A new concrete sidewalk next to an area of gravel being prepared for paving, with modular buildings and trees with fall colors in the background.A wide shot of a construction area on a sunny day, featuring modular buildings, shipping containers, and a graded dirt lot next to large pine trees.A large metal storage container sits on disturbed ground next to a fenced play area with balls and a soccer goal, with autumn trees in the background.A bright sun shines over a modular building and two shipping containers on a dirt lot with tire tracks. Tall pine trees line the area.